Software Project Status Overview Go beyond task, effort, and schedule metrics to get an accurate picture of software project status based on actual software productivity and features completed.Plan versus actual time series charts with customizable control bounds show when staff, cost, and other actual measures fall outside of tolerance rangesSlide the "as-of" arrow to any date on the project timeline to get a report of the Plan, Actual, and Difference (positive or negative) values for Key Performance Indicators (KPIs)
Software Product Construction Metrics Leverage multiple software product construction metrics to identify negative trends that will likely continue unless corrected.Side-by-side charts of plan versus actual Capabilities, Features, Epics, User Stories, and Story Points show the relative progress of each and the rate of requirements decompositionFeatures or Source Lines of Code (SLOC) complete alongside Integration Builds can expose product quality issues due to a lack of thorough testing
Software Project Predictive Forecasts Software project plans are highly uncertain and often include overly optimistic assumptions, especially regarding productivity. Forecast realistic estimates to complete based on actual productivity and features completed.Curve Fit regression forecasts predict project end dates for each plan metric profileEnter forecast assumptions different from the plan to model the impact of changes to scope or other project success factorsUse QSM default metric weights, such as Features or Defects, or assign user-defined weights that favor the most trustworthy progress indicatorsGenerate Maintenance Forecasts based on planned versus actual defects to determine when the software quality is good enough to release
Compare Multiple Plans & Forecasts SLIM gives you the power to quickly run and log multiple forecasts and turn forecasts into plans to determine the best course of action.